The Honking Goose™

Nothing to See

She Who Must Be Obeyed | 30 September 2026 | The Parish Pump

There is a report and it concerns a river. The river is the Fitzroy, at Rockhampton. Queensland wants to hold Olympic rowing and canoe sprint events on it in 2032. Before it could do that, somebody needed to establish whether the river was suitable. So the Games Independent Infrastructure and Coordination Authority commissioned an assessment, and a marine engineering firm called WaterProof did the work.

On the seventeenth of September, in Parliament, the Premier told everyone how it went. "It's official," David Crisafulli said. "Signed, sealed and delivered." The river, he said, had passed with flying colours. A few days later he was asked whether he had read the assessment himself. He had not. "I can only point to you for the comments of the experts," he said. "I have read the comments." Reading the comments and reading the report are two different activities.

Andrew Powell, the Tourism and Environment Minister, was asked the same question on the Tuesday. He said he hadn't read it. When someone asked why the full assessment hadn't been made public, he said it was "not my report."

Jarrod Bleijie, the Deputy Premier, was asked when he was in Rockhampton on the Monday. He declined to say whether he had or hadn't.

Donna Kirkland, the local member, whose electorate is getting the actual rowing course, was asked as well. She also said, "It's not my report to see".

Rowing Queensland hasn't seen it. Its chief executive, Anthea O'Loughlin, said so plainly. Rowing Australia hasn't seen it either, which is a strange thing to be able to say about the national body for the sport that is being installed on the river.

Somebody has read it, obviously. GIICA commissioned it, so GIICA has it. World Rowing and Paddle Worldwide reviewed its findings closely enough to endorse the course off the back of them. Their joint statement said the river could provide a safe, fair and consistent field of play, under the conditions assessed. It also said several additional elements still needed to be confirmed in the next phase of planning.

That statement was released on the Friday, the day after the Premier stood up in Parliament and declared the matter signed, sealed and delivered. So there was nothing for him to leave out. The qualification hadn't been written yet. By the next day, it had.

The International Olympic Committee still has a sustainability and environmental report to approve. It hadn't approved it by the following week. GIICA still has to finish something called a Project Validation Report, covering design, value for money and legacy. It hadn't finished that either. So the part that was signed, sealed and delivered turns out to be one part of several, and the other parts are still out for approval, which is not usually what those three words mean when a person says them in a room full of journalists.

The Opposition Leader, Steven Miles, made the obvious point, the way oppositions do. If there's a report, he said, the way to prove it is to release it. Nobody has released it.

Four years ago, as Opposition Leader, Mr Crisafulli complained that eight hundred thousand documents were sitting under lock and key in Queensland, and that this wasn't good enough. He did not specify a number for the assessment currently sitting somewhere between GIICA and the people who commissioned it. Presumably it's smaller. It would be, being one report.

What we have instead is a river, a Premier who read the comments, a minister who read nothing, a Deputy Premier who wouldn't say, a local member who said it wasn't her report to see, two Australian sporting bodies who haven't seen it, and two international federations satisfied by findings the rest of us aren't allowed to see.

The findings are reassuring, apparently. Whether the report supports quite everything being said, nobody outside a very small group is currently in a position to check. The river hasn't changed. It's still got a barrage, a current, and by most accounts around five hundred crocodiles. It was there before the report and it'll continue to be there after it.